ITF NSA #9 - East Weaver Creek Date Out For Review: 5-Apr-97


Report Submitted By: USACE

AGENCY DATE COMMENT COMMENT RECEIVED

RECEIVED


USACE 5-Apr-97 Per the draft PIR, the sponsor supports repair of the levee.


FEMA 15-Apr-97 Repair levee to pre-disaster condition. No alternatives to

offer at this time.


EPA


BOR 17-Apr-97 Concur with draft PIR to repair the levee.


FWS


USGS


BLM


NRCS 8-Apr-97 The levee protects a town , so the NRCS floodplain

easement program does not appear suitable.


EDA


NMFS 7-Apr-97 No NSA authority available to their knowledge. However,

if possible, the project should be designed to promote the

establishment of riparian vegetation for fisheries habitat.


CALFED 17-Apr-97 A non-structural alternative is not readily apparent.


DWR 11-Apr-97 No NSA alternative available.