INDEX OF REVIEW COMMENTS/ISSUES

Costs Floodplains Plan Formulation
Economics Local Cooperation  Real Estate
Environmental Other  


Costs
Aesthetic Costs for Ecosystem Restoration
Basis of Design and Cost Estimate
Cost Apportionment NER NED LPP

Costs For HTRW and Cultural Resources

Cost Sharing
Disposal Costs at Wetland Restoration Site

Engineering Appendix
Implementation Costs
Inconsistent Implementation Costs
Incremental Cost Analysis (ICA) And Cost 

Effectiveness Determination (CED)
 
Project Purpose
Recreation Plan Benefits and Costs
Local Cooperation
Cost Apportionment NER NED LPP
Credit for Work Completed by the Sponsor
Items of Local Cooperation (Pine Flat Dam  Final)

Nonfederal Sponsor

Nonfederal Sponsors

Nonfederal Sponsor's Letter
Nonfederal Sponsor Letter (Murrietta Creek PGM)
Nonfederal Responsibilities

OMRR&R
OMRR&R (Pine Flat Dam)

O&M existing Cache Creek Levee Project

OMRR&R (Pine Flat Dam Final)

Section 104 Credit
Economics
B/C for Restoration
Benefit Categories
Benefit-Cost Ratio Based on Existing Conditions

Damages to Rancho California Sewage Plant
Depth-Damage Relationships
Economic Evaluation (Murrietta Creek PGM)

Economic Documentation Requirements
     Risk Analysis
     Benefit Estimation Technique
     Residential Structure Plus Land Value
     Environmental Damage Benefit

Flood Damages - Southwest Valley
    Documentation of Historic Flood Damages
    Verification of Flood Damage Model
    Derivation of Flood Flows
    Use of MONTE Instead of HEC-FDA

Flood Damage Reduction Benefits - Southwest Valley
    Benefits Associated with Separable Features
    Potential Flood Insurance Cost Savings
   Current Versus Future Benefits
   Structure Values

Financial Versus Economic (NED) Costs
Financing Plan

Flood Damage Analysis
Flood Damage Reduction Justification
Food Insurance Administrative Cost Savings

Historical Flood Damages
Incremental Cost Analysis - Bolinas AFB

Incremental Cost Analysis (ICA) And (CED)
 
NED Environmental Restoration Plan
Least Cost Disposal Site - Bolinas AFB
Project Benefits - Bolinas AFB

Project Life

Recreation Plan Benefits and Costs
Replacement Costs for "Historic" Structures
Risk and Uncertainty
Risk and Uncertainty (Murrietta Creek PGM)

Use of Partial Duration Discharge Frequency Data
Value of Residential Contents
Plan Formulation
Alternatives, Explanation of
Authority
    (1) Project Implementation
    (2) Budget Authority
    (3) Special Cost Sharing
    (4) Basis for Federal Interest Described in 1986

B/C for Restoration
Cost Apportionment NER NED LPP
Environmental Restoration

Formulation Of Ecosystem Restoration Alternatives
    Significance and Value of Ecosystem Restoration 

Alternative Outputs

    Scope of Ecosystem Restoration Alternatives
    Incremental Analysis
    Justification and Cost Allocation
    Retention Basin Sizing Uncertainty
    Costs

Existing Flood Damage Reduction Project
Formulation - Lower Mission Creek

Formulation - Southwest Valley
    Identification of NED Plan
    Urban Drainage Criteria
    Local Drainage Versus Flood Control
    Non-structural Alternatives

Identification of NED Plan
Identification of  Sponsor by Purpose
Main Report - Tres Rios Final PGM 

NED Environmental Restoration Plan
One Time Dredging Effort- Bolinas AFB

Plan Formulation (Murrietta Creek PGM)

Planning Objectives
Recreation Plan Benefits and Costs
Recreation on Ecosystem Restoration Lands

Relationship Hamilton & Bolinas Projects

Report Recommendation
W/O Project Conditions
Environmental
50-Year Habitat Projection - Bolinas AFB
Aesthetics for Ecosystem Restoration

Byrd Slough Restoration Monitoring

EIS Comments - Tres Rios Final PGM.
Environmental Outputs (SW Valley)

    Scope of Ecosystem Alternatives
    Incremental Analysis
    Justification and Cost Allocation
    Retention Basin Sizing Uncertainty
    Costs

Formulation Of Restoration Alternatives

Environmental Requirements
     Endangered Species
     Plan Selection/Environmental Benefits

Environmental Restoration (Pine Flat Dam)
Historical & Projected Habitats - Bolinas AFB
Land Acquisition for Mitigation

Mitigation

Mitigation Land

Monitoring For Mitigation Restoration

Project Impacts
NED Environmental Restoration Plan

Recreation on Restoration Lands

Seadrift Lagoon Component

Significance and Value of Restoration
Upland Habitat
Other
Cost Sharing
Counsel Comments - Tres Rios Final PGM

Draft Feasibility Report - Pine Flat Dam


Certification of Legal Review
Documentation of  Review

Engineering Appendix
FRC Comments - Tres Rios Final PGM

Nonfederal Sponsor's Letter

Permit Requirements
Potential Effects On Settling Basin Project

Project Description and Performance

Modifications - Cache Creek Settling Basin

O&M dredging - Bolinas AFB

Operations and Maintenance Plan

Report Recommendation
Sand Levees
Tribal Lands Within Project Boundaries
Real Estate
Real Estate Plan (Cache Creek AFB)
   ER 405-1-12 Requirements
   Flood Proofing and Easements

Real Estate (Lower Mission Creek PGM)

Real Estate Plan - Middle Creek

Real Estate (Murrietta Creek PGM)

Real Estate Plan (Pine Flat Dam)
Real Estate - Southwest Valley (AFB)
Real Estate Appendix (Tanque Verde Creek)
RE Comments-  Tres Rios Final PGM 
Recreation on Ecosystem Restoration Lands

Flood Plains
Correspondence With Latest FEMA Map

Recommended plan and Residual Flooding
Number of Structures by Flood Frequency

Future Structures in the Floodplain
Removal of Residences

Last Update: 06 Oct 2006     Comments?