Around the South Pacific Division

The U.S. Army Corps of Engineers Los Angeles District has approved a proposal to temporarily extend the amount of time the Salt River Project can hold water in a portion of the Flood Control Space at Roosevelt Dam in Arizona from 20 to 120 days....
Programs Delivery Analysis Division Aims to Drive “Winning” Projects & Programs Delivery at SPD
On the medal’s front is “A Memorial and Reward for Courage and Boldness” in Latin. In the center appears the image of a helmeted soldier standing amidst the ruins of a fort, holding in his right hand an unsheathed sword, and in his left the staff of...

South Pacific Division District Links

  District list

  • Facebook
  • X

South Pacific Division News

NEPA scoping period begins for SF Waterfront Flood Resiliency Study

U.S. Army Corps of Engineers San Francisco District
Published Aug. 24, 2020
Updated: Aug. 24, 2020

SAN FRANCISCO – The U.S. Army Corps of Engineers (USACE) San Francisco District is currently preparing a feasibility study to evaluate coastal storm and flood risk management alternatives along 7.5 miles of the San Francisco Waterfront. Specifically, the study area runs from Aquatic Park to Herons Head Park. This area is highly urbanized, supporting commercial, residential, recreation, tourism and open space land uses, with a complex mix of piers, structures and seawall – many of which are considered historic. The Port of San Francisco is the non-federal partner for the study.

USACE will conduct early National Environmental Policy Act (NEPA) scoping to solicit public participation and input that will assist with determining the appropriate level of NEPA documentation for the study.

KEY DATES

USACE requests written comments regarding NEPA scoping be received by Oct. 21, 2020. Written comments may be emailed to SFWFRS@usace.army.mil or mailed to: Ms. Anne Baker, 450 Golden Gate Ave, 4th Floor, San Francisco, CA 94102.

In addition, there will be two opportunities for submitting comments during a pair of USACE-led virtual public meetings on Sept. 16, 6-7:30 p.m. and Sept. 17, 1-2:30 p.m. If interested, please RSVP at SFWFRS@usace.army.mil, and a WebEx meeting link will be sent to you. 

* Please note that the San Francisco Planning Department is the California Environmental Quality Act (CEQA) lead agency for the study. The Planning Department is conducting CEQA review under a separate process, which is not part of this early scoping effort under NEPA.

ABOUT THE STUDY

The primary issue this study will investigate is flooding from large coastal storms and extreme high tide events. The importance of the study is to protect the San Francisco waterfront, including major transportation infrastructures and the City’s financial district, with an estimated $22 billion in public sector assets at risk. Recent inspections along the waterfront have revealed portions of the seawall in need of repair (joints of steel plates and distress of concrete face). Expected impacts from continued deterioration of the waterfront would include: severed access to passenger ferries; damaged piers, wharves and the buildings on top of them; distorted streetcar tracks; cracks in the Embarcadero roadway and promenade; and disrupted utilities, in addition to risk to health and life safety.


Learn About Our Unique Mission Below!

News Releases

NEPA scoping period begins for SF Waterfront Flood Resiliency Study

U.S. Army Corps of Engineers San Francisco District
Published Aug. 24, 2020
Updated: Aug. 24, 2020

SAN FRANCISCO – The U.S. Army Corps of Engineers (USACE) San Francisco District is currently preparing a feasibility study to evaluate coastal storm and flood risk management alternatives along 7.5 miles of the San Francisco Waterfront. Specifically, the study area runs from Aquatic Park to Herons Head Park. This area is highly urbanized, supporting commercial, residential, recreation, tourism and open space land uses, with a complex mix of piers, structures and seawall – many of which are considered historic. The Port of San Francisco is the non-federal partner for the study.

USACE will conduct early National Environmental Policy Act (NEPA) scoping to solicit public participation and input that will assist with determining the appropriate level of NEPA documentation for the study.

KEY DATES

USACE requests written comments regarding NEPA scoping be received by Oct. 21, 2020. Written comments may be emailed to SFWFRS@usace.army.mil or mailed to: Ms. Anne Baker, 450 Golden Gate Ave, 4th Floor, San Francisco, CA 94102.

In addition, there will be two opportunities for submitting comments during a pair of USACE-led virtual public meetings on Sept. 16, 6-7:30 p.m. and Sept. 17, 1-2:30 p.m. If interested, please RSVP at SFWFRS@usace.army.mil, and a WebEx meeting link will be sent to you. 

* Please note that the San Francisco Planning Department is the California Environmental Quality Act (CEQA) lead agency for the study. The Planning Department is conducting CEQA review under a separate process, which is not part of this early scoping effort under NEPA.

ABOUT THE STUDY

The primary issue this study will investigate is flooding from large coastal storms and extreme high tide events. The importance of the study is to protect the San Francisco waterfront, including major transportation infrastructures and the City’s financial district, with an estimated $22 billion in public sector assets at risk. Recent inspections along the waterfront have revealed portions of the seawall in need of repair (joints of steel plates and distress of concrete face). Expected impacts from continued deterioration of the waterfront would include: severed access to passenger ferries; damaged piers, wharves and the buildings on top of them; distorted streetcar tracks; cracks in the Embarcadero roadway and promenade; and disrupted utilities, in addition to risk to health and life safety.