Around the South Pacific Division

South Pacific Division joined partners from The Port of San Francisco at the historic Ferry Building Jan. 26, to announce release of the draft San Francisco Waterfront Coastal Flood Feasibility Study for a 60-day review and public comment. SPD...
Leaders from the U.S. Army Corps of Engineers San Francisco District and East Bay Municipal Utility District signed a milestone project partnership agreement Jan. 26, 2024, paving the way for construction of the first recycled water pipeline to...
Danny Baldwin, a U.S. Army Corps of Engineers contractor, checks a dozer arm for proper operation at Folsom Dam Dike 1 in Granite Bay, California, November 15, 2023. The USACE Sacramento District is raising the dike up to 3.5 feet in accordance with...
Doug Chitwood, U.S. Army Corps of Engineers Los Angeles District lead project engineer, left of center, talks with Col. James Handura, commander of the Corps’ South Pacific Division, right, during a site tour Jan. 18 on the Rio Hondo side of...
Three eagles perched in a tree are seen through a telescope at John Martin Reservoir, Colo., during the annual mid-winter bald eagle survey there, Jan. 12, 2024.

South Pacific Division District Links

District MapDistrict list

South Pacific Division News

Results:
Tag: Sacramento River
Clear
  • December

    Sacramento District quick to adapt in face of COVID

    USACE Sacramento District has a proven track record of facing challenges head-on. When 2020 brought with it the Novel Coronavirus, the District responded quickly to address the needs of a rapidly changing work environment.
  • Facebook
  • X

News Releases

Results:
Tag: Sacramento River
Clear
  • USACE awards $40.9 million construction contract for Pocket-area levee improvements

    The U.S. Army Corps of Engineers Sacramento District awarded a $40.9 million construction contract on December 22, 2021, to Maloney Odin Joint Venture of Novato, for 2 miles of levee improvements along the Sacramento River East Levee in Sacramento’s Pocket neighborhood. Construction in 2022 will entail installation of a seepage cutoff wall from Surfside Way at the northern end of down to Sump 132 at the Pocket Canal on the southern end.
  • USACE awards $29.5 million construction contract for Sacramento River levee improvements

    The U.S. Army Corps of Engineers Sacramento District awarded a $29.5 million construction contract on January 15 to Nordic Industries Inc. of Olivehurst, for 1.8 miles of levee improvements at four sites along the Sacramento River East Levee. Construction in 2021 will entail installation of seepage cutoff walls on both sides of Business 80/Highway 50 just upstream of Miller Park, on the south side of the little pocket, and on the north side of the big pocket.