US Army Corps of Engineers
South Pacific Division

Final Folsom spillway gates installed
Sacramento District construction crews at the new Folsom Dam auxiliary spillway lowered the six bulkhead gates into place Jan. 26, 2015.

Download Image: Full Size (0.05 MB)
Tags:
Photo by: Seth Frank |  VIRIN: 150127-A-ZZ999-999.JPG