Corps river and creek cleanup project removes 575 tons of debris
In a section of river at the confluence of San Jose Creek and San Gabriel river not disturbed by illegal camping, the natural beauty of the land managed by the U.S. Army Corps of Engineers Los Angeles District is revealed. The U.S. Army Corps of Engineers Los Angeles District cleared about 120 acres of creek and riverbank, Sept. 27-Oct. 22, 2021, in an ambitious cleanup project.

Download Image: Full Size (2.26 MB)
Tags:
Photo by: William John Reese |  VIRIN: 210927-A-ED169-1010.JPG