State of the Infrastructure
The Folsom Dam Auxiliary Spillway project is an approximately $900-million cooperative effort between the U.S. Army Corps of Engineers and the U.S. Department of the Interior, Bureau of Reclamation.

Download Image: Full Size (1.44 MB)
Tags:
Photo by: Reclamation Official Photo |  VIRIN: 200203-A-CE999-001.JPG