Around the South Pacific Division

The Los Angeles District is responsible for 14 harbors along the Southern California coast stretching from San Diego Harbor near the Mexican border to Morro Bay Harbor on California's central coast.
The Petaluma River is located on San Pablo Bay in Sonoma and Marin Counties, California. Operations and Maintenance (O&M) provides for dredging of a channel 200 feet wide to a depth of -8 feet Mean Lower Low Water (MLLW) across the flats in San...
The Humboldt Jetty project consists of repairs to the North and South Jetties that maintain the opening and the federal navigation channel into Humboldt Bay.
A U.S. Army Corps of Engineers South Pacific Border District contractor performs safety work at the Tucson 3 former wall construction site near Douglas, Arizona,
Isabella Reservoir is located forty miles northeast of Bakersfield, Kern County, California, and consists of an earthfill main dam and auxiliary dam across Kern River and Hot Springs Valley, respectively. The dam was authorized under the Flood...

South Pacific Division District Links

District MapDistrict list

South Pacific Division News

    • No Items.
  • FacebookFacebook
  • XX

News Releases

  • August

    District employee earns Civil Responder of the Year

    When Jessica Fischer started her career at the Army Corps of Engineers 11 years ago, she didn’t plan on becoming an emergency manager. She was set on a quiet career as a Project Engineer at the New York District. Then 2011 happened.
  • NEPA scoping period begins for SF Waterfront Flood Resiliency Study

    The U.S. Army Corps of Engineers San Francisco District is currently preparing a feasibility study to evaluate coastal storm and flood risk management alternatives along 7.5 miles of the San Francisco Waterfront. USACE requests written comments regarding NEPA scoping be received by Oct. 21, 2020.
  • NEPA scoping period begins for SF Waterfront Flood Resiliency Study

    The U.S. Army Corps of Engineers San Francisco District is currently preparing a feasibility study to evaluate coastal storm and flood risk management alternatives along 7.5 miles of the San Francisco Waterfront. USACE requests written comments regarding NEPA scoping be received by Oct. 21, 2020.